Chi Siamo

Didattica

Ricerca

Collabora

Persone

Magazine

Contatti
EN

Inizio

Febbraio 2014

Fine

Febbraio 2017

Status

Completato

CleanSky | TETRA (TEst of Tilt-Rotor Air intakes)

Inizio

Febbraio 2014

Fine

Febbraio 2017

Status

Completato

The objective of the project was the assessment, by means of wind tunnel testing, of the effectiveness of the optimization carried out by GRC2 consortium on the internal duct shape of the ERICA tilt-rotor air intake. The tests was carried out on a rather high scale and quite complex model of the nacelle, including a part of the tilting wing and a rotating hub with the blade stubs. Beside the classical pressure and flow measurements, also some internal PIV surveys were carried out to get details of the flow field.

More info: https://cordis.europa.eu/project/id/619949 ↗

Scheda progetto

Grant agreement ID

619949

Program

FP7-JTI - Specific Programme "Cooperation": Joint Technology Initiatives

Call

SP1-JTI-CS-2013-01

Topic

JTI-CS-2013-1-GRC-02-016 - Assessment of optimized tiltrotor engine intake performance by wind tunnel tests

Start date

01-02-2014 | Length: 36 months

Laboratori Scientifici